Geotechnical research for 4 shafts

Carrying out detailed geotechnical research for the needs of construction of new mining facilities – 4 vertical shafts on the location of the SERBIA ZIJIN Bor mine complex. The aim of the subject research is to reduce geological and geotechnical unknowns, to analyze in detail the geotechnical environment and the facts that form the geotechnical conditions for the construction of the shaft. All this in order to contribute from the geotechnical aspect in the form of a quality base for the development of a quality Supplementary mining project that will develop and select optimal technical solutions for the construction and permanent installation of new mining shafts of wind output (Shaft 1 and Shaft 2), shafts for input air current (Window 3) and auxiliary shaft (Window 4), with the necessary drawings and a view of the fit of the new facilities to the existing condition in the mine; calculations, ie application of valid standards and prescribed technical measures for that type of facilities; substrates for construction design; measures for protection of facilities, equipment and plants, as well as measures and necessary means for personal protection and organization of first aid.
Client:: SERBIA ZIJIN COPPER DOO BOR
Realization period: April – September 2020
Core activity: Geotechnics, Exploratory drilling, Hydrogeology, Geophysic

  • Date: October 25, 2020
  • Category:
  • GEOTEHNICKA-ISTRAZIVANJA
  • GEOTEHNICKA-ISTRAZIVANJA